- Line Balancing in Flowshops with Single and Dual Gripper Material Handling Robots, TUBITAK 1001, 213M435, 2013-2015, 126.800TL
- Throughput
maximization in flowshops with flexible operations: Benefits of
flexibility, mathematical modeling and solution procedures, TUBITAK 3501 Career Project, 110M489,
121530TL, May 2011-May 2013.
- Throughput maximization in the Fiancate body
assembly line, TOFAS,
45000TL, March-December 2008.
|